Home/Case Studies/Case Study 03 · FEED Verification & Detail Engineering — CRPO 116
CASE STUDY 03L&T Hydrocarbon / Saudi AramcoClient: Petrocon Engineers

FEED Verification & Detail Engineering — CRPO 116

Instrumentation FEED verification, detail engineering & RFP compilation for 3 tie-in (TP-01, 02 & 03) & 3 wellhead platforms (BRRI 19/22, 58/63 & 101/106)

All 13 Case Studies
Disciplines:InstrumentationElectrical
Client / EPCPetrocon Engineers
End User / OperatorL&T Hydrocarbon / Saudi Aramco
Verified Man-Hours1,500 hrs
Deliverables Issued40 Docs
Execution CentersNavi Mumbai & Chennai
QA GovernanceISO 9001:2015
AUDITED SCOPE & METHODOLOGY

Engineering Case File Analysis

For FEED Verification & Detail Engineering — CRPO 116, Saur Engineering was engaged by Petrocon Engineers to deliver multidisciplinary engineering design and verification services complying with L&T Hydrocarbon / Saudi Aramco technical specifications, safety guidelines, and international engineering codes.

The scope required 1,500 verified engineering man-hours across Instrumentation, Electrical disciplines, resulting in the generation and formal client handover of 40 approved technical deliverables.

Our delivery teams in Navi Mumbai and Chennai executed 3D model clash checks, calculation validations, cable routing, and material take-offs to guarantee constructability and zero on-site rework.

Verified Deliverables Breakdown

Exact engineering documents generated and verified under ISO 9001:2015 QMS.

10 Line Items
01FEED Verification Deliverables Package
2 documents
FEED verification report for 3 tie-in platforms (TP-01, TP-02 & TP-03)
FEED verification report for 3 wellhead platforms (BRRI 19/22, BRRI 58/63 & BRRI 101/106)
02Detail Engineering Deliverables Package
6 documents
ESD Cause & Effect diagram
F&G Cause & Effect diagram
F&G layout modification
Instrument piping installation (IPD) drawings
Instrument point & lines (IPL) layouts
Valve list
03MR Review for E&I Items Deliverables Package
2 documents
Electrical — 480V AC switchrack modification, electrical junction box, LV power panel & LV cables
Instrumentation — SCADA modification, hydraulic ESD system

Technical Governance & Specification Matrix

CAD / CAE Platforms
Smart 3D · SmartPlant Instrumentation (SPI / INtools) · AutoCAD · ETAP · Dialux · Smart 3D (Electrical)
Governing Standards
Saudi Aramco Engineering Standards (SAES / SAEP) · ASME Sec VIII · API 650 · ISO 9001:2015
Engaged Disciplines
Instrumentation · Electrical
QA & Verification Protocol
ISO 9001:2015 Accredium Cert. GACB892020251128 · Multi-tier Lead Engineer Sign-off · Zero Clash Policy
ENGINEERING ENGAGEMENT

Require Similar Scope Execution?

Our Navi Mumbai HQ and Chennai engineering centers integrate seamlessly with your project schedules, CAD databases, and operator specifications.

HeadquartersNavi Mumbai, India
Engineering HubChennai, India
Operator StandardsADNOC · Aramco · EMARAT · Pertamina
QA CertificationISO 9001:2015 QMS