AiP5 Onshore Wellhead — Telecom
Telecom engineering for 132 onshore well pads (ESP, GLW, WIW, WAG, OPW & PWDW)
Engineering Case File Analysis
For AiP5 Onshore Wellhead — Telecom, Saur Engineering was engaged by Petrocon Engineers to deliver multidisciplinary engineering design and verification services complying with ADNOC technical specifications, safety guidelines, and international engineering codes.
The scope required 4,000 verified engineering man-hours across Telecommunication disciplines, resulting in the generation and formal client handover of 264 approved technical deliverables.
Our delivery teams in Navi Mumbai and Chennai executed 3D model clash checks, calculation validations, cable routing, and material take-offs to guarantee constructability and zero on-site rework.
Verified Deliverables Breakdown
Exact engineering documents generated and verified under ISO 9001:2015 QMS.
Technical Governance & Specification Matrix
Require Similar Scope Execution?
Our Navi Mumbai HQ and Chennai engineering centers integrate seamlessly with your project schedules, CAD databases, and operator specifications.
Explore Adjacent Engineering Studies
AiP5 Onshore Wellhead — Instrumentation
Instrumentation engineering for 132 onshore well pads (ESP, GLW, WIW, WAG, OPW & PWDW)
FEED Verification — MTO (Lower Zakum)
Long Term Development Plan Phase-1 for Lower Zakum Field — Das Island Terminal Facilities (Package 5)
5b5c Onshore Wellhead — Telecom (Mini Pad & BUHASA)
Telecom engineering for 4 mini pads & BUHASA field (MP-109, MP-119, MP-125, MP-137 & BUHASA)
