Home/Projects/Amine Treated Gas Cooler — Piping Stress Analysis
2025-2026Refineries & Gas PlantsIndonesia

Amine Treated Gas Cooler — Piping Stress Analysis

Critical piping stress analysis calculation reports and nozzle load evaluations for Amine Treated Gas Cooler Package under ASME B31.3.

All 18 Projects
Disciplines:Piping
Client / EPCPT. Pertamina Hulu Energi
End User / OperatorPertamina
Verified Effort1,540 hrs
Deliverables IssuedStress Calculation Reports Docs
Asset LocationIndonesia
QA GovernanceISO 9001:2015
AUDITED SCOPE & METHODOLOGY

Multidisciplinary Engineering Scope

For Amine Treated Gas Cooler — Piping Stress Analysis, Saur Engineering was engaged by PT. Pertamina Hulu Energi to perform specialized engineering design services complying with Pertamina standards, operator specifications, and international design codes.

Our multidisciplinary execution team in Navi Mumbai and Chennai conducted front-end package verification, detailed 3D modeling, stress and thermal calculations, material take-offs (MTO), and complete drawing package preparation to guarantee zero site-level clashes and seamless constructability.

Verified Execution Highlights

CAESAR II High-Temp Stress Runs
Nozzle Load Verification on Exchangers
ASME B31.3 Compliance Audits

Engineering Specification Matrix

CAD / CAE Platforms
CAESAR II · PVElite
Governing Design Codes
ASME B31.3 / B31.4 / B31.8 · API 579-1 Fitness-for-Service · API 650 · DEP Shell
Engaged Disciplines
Piping
QA & Verification Protocol
ISO 9001:2015 Accredium Cert. GACB892020251128 · 100% Clash-Free Navisworks QA

Document Deliverables by Phase

01.

FEED Verification & Design Basis Calculations

Process simulation validation, design basis verification, piping stress analysis reports, and equipment sizing datasheets.

02.

3D Model Integration & General Arrangements

Smart 3D multi-discipline models, equipment layouts, piping GA drawings, and clash detection resolution packages.

03.

Fabrication & Spool Isometrics

Isometric drawing packages, weld maps, spool sheets, structural support details, and bill of materials.

04.

Procurement Support & Material Take-Offs

Comprehensive MTOs, valve schedules, specialty item technical datasheets, and vendor quote review support.

ENGINEERING ENGAGEMENT

Require Similar Engineering Scope?

Our Navi Mumbai HQ and Chennai engineering centers integrate seamlessly with your project schedules, CAD databases, and client specifications.

HeadquartersNavi Mumbai, India
Engineering HubChennai, India
Delivery FootprintUAE · KSA · Indonesia · India
QA CertificationISO 9001:2015 QMS